BEST Progress
Work packages and deliverables

Work package 1 – Bio-based materials selection

Number Name Due, Leader Status
D1.1 Raw materials selection, processing and definition of a taxonomy for bio-based composites M12, UniSA ✔️
D1.2 Identification of potential products and rational mixture proportioning for bio/based composites M18, BAS ✔️️

Work package 2 – Thermo-hygrometric behaviour

Number Name Due, Leader Status
D2.1 Experimental evidences on the material and structural thermal characterization of bio-composites M28, TUDa ✖️
D2.2 Theoretical modelling and numerical simulation of thermal performances M36, TUDa ✖️

Work package 3 – Mechanical performance

Number Name Due, Leader Status
3.1 Experimental evidences on the mechanical and structural performance of bio-composites and systems M28, UniGE ✖️
3.2 Theoretical modelling and numerical simulation of durability performances M36, UniGE ✖️

Work package 4 – Durability

Number Name Due, Leader Status
4.1 Experimental evidences on the durability performance of bio-composites and systems M28, UAH ✖️
4.2 Theoretical modelling and numerical simulation of mechanical and structural performances M36, UAH ✖️

Work package 5 – Sustainability

Number Name Due, Leader Status
5.1 Bio-composites performance requirements M34, UniSA ✖️
5.2 Dynamic LCA and parametric carbon footprint calculation as a tool to design climate neutral buildings with bio-composites M38, UniSA ✖️
5.3 The BEST model for designing bio-composites M43, UniSA ✖️

Work package 6 – Demonstration

Number Name Due, Leader Status
6.1 Prototyping M46, BAS ✖️
6.2 Production protocol for industrial upscaling M48, WRS ✖️

Work package 7 – Communication & Dissimination

Number Name Due, Leader Status
7.1 Preparing a web-based platform M48, UniSA ✖️
7.2 Preparing a Marketing and Business Plan for product exploitations M48, UniSA ✖️
7.3 Editing a textbook M48, TUDa ✖️
7.4 Standards and pre-Code provisions M48, UAH ✖️

Work package 8 – Management & Coordination

Number Name Due, Leader Status
8.1 Data Management Plan M6, TUDa ✔️
8.2 Dissemination and exploitation plan M6,TUDa ✔️
8.3 Progress report M12, TUDa ✔️
8.4 Mid-term meeting report M18 M18, TUDa ✔️️